Construction of road on low-lying area / swampy / flood-prone area.
Maindrain is constructed on both side and soil spoils are leveled on the proposed road thus making the road higher than the field of the original land area.
Sunday, November 9, 2008
Oil Palm Plantation-Bundroad Construction
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment